LONG ISLAND VIADUCT

Boston, Massachusetts

The project consisted of one mile of roadway and side slope reconstruction on Moon Island Road in Boston. The badly deteriorated side slopes were replaced with a stone paved blanket for stabilization and elimination of progressive erosion due to wave action. A Notice of Intent was filed with the Quincy Conservation Commission.

Roadway reconstruction included full depth construction on portions of the existing roadway, cold planning and paving on the remaining portion. New guardrail and street lighting throughout the entire corridor was designed and installed.

ASEC Corporations engineering and surveying staff completed the design of this project in four months.


COST:
Construction Cost: $1,000,000.00

COMPLETION DATE:
July, 1997

OWNER:
Department of Neighborhood Development
aka Boston Public Facilities Department
26 Court Street
Boston, MA